The “Mast job” was a coatings project calling for 9 technicians for 3 months that morphed into an 8 month expanded access mega project. RAC Group supplied access, rigging and technicians to coat 36 fifty meter tall masts and support these beams while connecting arches were installed.

“Once we got started everyone wanted a piece of our capability,” says Operations Manager Chris Aziz. We expanded our available personal, working schedule, rigging locations and job scope to meet the needs of this iconic structure. RAC was into the arena completing work before scaffolds’ could get a price quote done.

Project Statistics:

Location: Vancouver, BC April 8, 2011-Jan 2012
Client: CCS Coatings
General Contractor: PCL

Project specifications:

  • 9 Technicians
  • 1 Ground support
  • 6500 original hours contracted. 18,000 rope hours to date with additional 4,000 support ground hours on site
  • 10,000 additional rope hours completed by CCS employees and IW97 personnel applying coatings under RAC supervision
  • Over 200,000 sq.ft. of structural steel prepped cleaned and coated with a two-coat epoxy coating system supplied by AkzoNobel
  • Rope Access training supplied to 22 CCS employees